韩国LINETECH气体质量流量控制器,超大流量2500升每分钟,
MS3700VA气体质量流量控制器英文使用说明。
韩国原装进口 主体材质:不锈钢316L 产品坚固耐用,耐腐蚀。
Mass Flow Controller,MS3700 Series (Analogue).The M-SERIES of Line Tech Mass Flow Controller (MFC) is a device designed for accurately measuring and controlling flow rates of gases. This manual is intended to provide the user with all the information to install successfully.
Mass Flow Controller is classified into three parts. (Body, P.C.B, Control valve) .This harmony produces stable gas flow of rate as well djusting gas pressure continuously.
▶Standard Ranges:1500 ~ 2500 slpm
▶Repeatability:±0.25%
▶Supply Power:+15Vdc ~ +24Vdc , 350 ㎃
▶Max Operating Temperature:0 ~ 50℃
▶Control Range:3 ~ 100%
▶Accuracy:±2%
▶In/Out Signal:0 ~ 5Vdc or 4~20mA
▶Max Operating Pressure: 13 barG
▶Leak Rate:1×10-9atm.cc/sec
▶Electrical Connection: Pin D-Connector
▶Response Time:Less than 3 seconds response to within 3% of Full Scale
※ Minimum operating pressure of LNG 50 SLPM : 0.27barG
※ Response time may be slow at intervals less than 10% on a full scale
Tuning is possible quickly, but there is a possibility of overshooting
Features
▶Accurate at Low Flow ▶Compact Connection
▶High Corrosion Resistance ▶Excellent Long-Term Stability
▶Wide Pressure Range Available ▶Fast response
▶Removable Highly Stable Sensor ▶Excellent Linearity
▶Modular Design
Installation
The M-Series of Line Tech inlet and outlet connection standard is V.C.R and S.W.G type.Install the equipment with consideration to the given structure and strength condition.Be sure to clean the inside of pipe line by blowing high-pressured gas before connecting to MFC.
※ Cautions When Installing ※
▶Check gas flow direction.
▶When using corrosive or inflammable gas, completely rid the system of moisture or leakage with N2 gas before the usage.
▶Do not install the equipment in the presence of possible mechanical damage or vibration.
Operation
◎Warm up time ◎
1) After installing, warm up equipment for 30 minutes to stabilize the temperature of the sensor.
2) Before supplying gas, adjust the zero point to less than 0.2%
3) Supply gas.
4) Check for any leakage.
5) Operate.
◎Setting up the Zero Point ◎
▶The Zero Point may change depending on the surrounding's temperature installation
structure.
▶Approximately 30 minutes after supplying power, when installed according to the
correct environment and application conditions, set up the final Zero Point.
李东静(Jessica Li) 手机(Mob):+86-13774472957 QQ:747187288