欢迎光临上海昕潼贸易有限公司网站,服务热线:+86-13774472957
m
当前位置:
LineTech-MS3700VA英文版使用说明书-上海昕潼贸易有限公司,超大流量2500升
来源: | 作者:昕潼 | 发布时间: 57天前 | 69 次浏览 | 分享到:
韩国LINETECH气体质量流量控制器,超大流量2500升每分钟,英文使用说明说.Mass Flow Controller,MS3700 Series (Analogue).The M-SERIES of Line Tech Mass Flow Controller (MFC) is a device designed for accurately measuring and controlling flow rates of gases. This manual is intended to provide the user with all the information to install successfully.

  韩国LINETECH气体质量流量控制器,超大流量2500升每分钟,

MS3700VA气体质量流量控制器英文使用说明。

韩国原装进口    主体材质:不锈钢316L    产品坚固耐用,耐腐蚀。


Mass Flow Controller,MS3700 Series (Analogue).The M-SERIES of Line Tech Mass Flow         Controller (MFC) is a device designed for accurately measuring and controlling flow rates of gases. This manual is intended to provide the user with all the information to install successfully.

MS3700VA气体质量流量控制器

Mass Flow Controller is classified into three parts. (Body, P.C.B, Control valve) .This harmony produces stable gas flow of rate as well djusting gas pressure continuously.

Standard Ranges:1500 ~ 2500 slpm

Repeatability:±0.25%

Supply Power:+15Vdc ~ +24Vdc , 350

Max Operating Temperature:0 ~ 50

Control Range:3 ~ 100%

Accuracy:±2%

In/Out Signal:0 ~ 5Vdc or 4~20mA

Max Operating Pressure: 13 barG

Leak Rate:1×10-9atm.cc/sec

Electrical Connection: Pin D-Connector

Response Time:Less than 3 seconds response to within 3% of Full Scale


Minimum operating pressure of LNG 50 SLPM : 0.27barG

Response time may be slow at intervals less than 10% on a full scale

Tuning is possible quickly, but there is a possibility of overshooting

Features

Accurate at Low Flow                               Compact Connection

High Corrosion Resistance                      Excellent Long-Term Stability

Wide Pressure Range Available                 Fast response

Removable Highly Stable Sensor           Excellent Linearity

Modular Design


Installation


The M-Series of Line Tech inlet and outlet connection standard is V.C.R and S.W.G type.Install the equipment with consideration to the given structure and strength condition.Be sure to clean the inside of pipe line by blowing high-pressured gas before connecting to MFC.

Cautions When Installing

Check gas flow direction.

When using corrosive or inflammable gas, completely rid the system of moisture or leakage with N2 gas before the usage.

Do not install the equipment in the presence of possible mechanical damage or vibration.

MS3700VA气体质量流量控制器接线图


Operation

 Warm up time

1) After installing, warm up equipment for 30 minutes to stabilize the temperature of the sensor.

2) Before supplying gas, adjust the zero point to less than 0.2%

3) Supply gas.

4) Check for any leakage.

5) Operate.

 

Setting up the Zero Point

The Zero Point may change depending on the surrounding's temperature installation

structure.

Approximately 30 minutes after supplying power, when installed according to the

correct environment and application conditions, set up the final Zero Point.

气体质量流量控制器气体换算

气体质量流量控制器响应时间